Sediment and Erosion Control Program Support for York Canyon Mine
   
Location
Raton, New Mexico

Date
2000-Present

Client
Chevron (P&M Coal)
Project Description

Water & Earth Technologies, Inc. (WET) has been working under a task order contract (since spring of 2000) to provide hydrologic services on an as-needed basis. Work completed-to-date includes erosion and sediment control modeling (using RUSLE 1.06 and SEDCAD 4.0) for both disturbed and reclaimed areas for compliance with the New Mexico Mining and Minerals Division (MMD) regulations and mine permit requirements. The work includes design of slope gradients and shapes; terrace placement and sizing; design of grass filters,


Sediment Pond Construction

 
  rock check dams, and silt fencing; design of diversion channels; design of other alternate sediment and erosion controls; and hydrologic, hydraulic and structural design of sediment ponds. SEDCAD 4.0 models have been developed and calibrated for effluent compliance monitoring locations to estimate sediment pond discharges resulting from measured precipitation events and rainfall distributions (for NPDES compliance).

 

[back]

 

Companies or products mentioned are trademarks or registered trademarks of their respective owners.
Copyright © 2001-2005 Water & Earth Technologies, Inc. 

Last modified: Friday December 09, 2005